• What is the Circuit?
  • Find Trails
  • My Circuit Trails
  • Happening #OnTheCircuit
  • Get Involved
  • Events
  • The Circuit Trails Blog
  • Press Room
  • Coalition Members
  • Coalition Partners
  • Community Grant Program
  • Circuit Trails Status Map
  • Sign Up for Newsletter
  • Resource Library
  • Menu Menu
  • Link to Facebook
  • Link to Instagram
  • Link to X
  • Link to Tiktok
Search Search
  • What is the Circuit?
  • Find Trails
  • My Circuit Trails
  • Happening #OnTheCircuit
Full Menu
Circuit Trails
Full Menu

D&R Greenway Connector Public Meeting (Zoom)

September 28, 2022 | 6:00pm - 6:00pm

D&R Greenway Connector Public Meeting (Zoom)

REGISTER
Share Post:
Maps were disabled by the visitor on this site. Click to open the map in a new window.

Date/Time
Date(s) - September 28, 2022
6:00 pm

Register to join the City of Trenton, Greater Trenton, Inc. and design consultant NV5 to learn more about the upcoming D&R Greenway Connector project in Trenton. This project will create a continuous bicycling connection between South Trenton and downtown by linking existing and new bicycle lanes. The project will also feature Trenton’s first protected intersection for bicyclists and a shared-use path connection to the Lower Trenton Bridge (aka, the Trenton Makes bridge). This project will link to the recently presented Cooper Field Connector project to eventually make a continuous connection between the D&R Canal Path in downtown with the D&R Canal Path that leads to Hamilton Township and Bordentown.

REGISTER
Back to all events

Follow the Circuit Trails

  • Link to Facebook
  • Link to Instagram
  • Link to X
  • Link to Tiktok
Menu
  • Contact
  • Sign Up for Newsletter
© 2025 The Circuit Trails. All Rights Reserved.
Scroll to top Scroll to top Scroll to top